针对白山电站一期工程尾水导流墙对一期3台机组出力情况进行了试验、分析、研究,阐述了3台机组在各种负荷下相应的出力受阻状况,进行了电能损失对比分析,并且提出了消除出力受阻的建设性意见。
According to the test and analysis on the output of three units of the first stage of Baishan Hydropower Station tailracewater diversion wall, the corresponding output restraint conditions of the three units under various loads are expounded. The comparative analysis of power loss is carried out. And put forward to eliminate the blocked output of constructive comments.