论文部分内容阅读
随着广州地铁五号线客运量的不断增长,高峰期间五号线的客流压力进一步加大,早高峰期间五号线下行列车满载率可高达135%,站台排队候车组织压力极大。本文对目前早高峰期间五号线下行的客流情况进行分析,从“按需定运”的角度提出相关优化建议,以缓解早高峰期间五号线下行的客流压力。
With the continuous growth of the passenger volume of Guangzhou Metro Line 5, passenger flow pressure on Line 5 further increased during the peak period, and the full-load factor of down-trains on Line 5 during early rush hour can reach as high as 135%. This paper analyzes the current passenger traffic on the 5th line during the early rush hour and puts forward relevant optimization suggestions from the perspective of “on-demand delivery” to ease the downward pressure on passenger traffic on the 5th line during the early rush hour.