论文部分内容阅读
结合实际工程,介绍了该应用的具体步骤。通过对工程的分析,绘制了网络图,找到了关键线路,并对工程计划进行了优化。
Combined with the actual project, introduced the specific steps of the application. Through the analysis of the project, the network diagram was drawn, the key lines were found, and the project plan was optimized.