论文部分内容阅读
介绍该厂采用浓缩机底流大排放浮选工艺前后的状况及改造煤泥水处理系统的措施,并利用实际生产资料说明所取得的技术经济效果。
This paper introduces the status of the plant before and after the use of thickener underflow large discharge flotation process and measures to transform slime water treatment system, and use the actual means of production to illustrate the technical and economic results achieved.