针对电力施工企业在合同实施过程中,建设项目的主、客观条件发生变化,出现与原合同不一致而导致施工企业实际工程费用增加、工期延长,甚至造成损失,提出了一种补偿办法,即索赔。阐述了索赔的起因、影响索赔成功的因素和索赔处理过程,通过案例分析,认为施工单位必须加强索赔管理,以便最大限度地挽回损失。
In the process of contract implementation, the main and objective conditions of construction projects have changed, and the inconsistency with the original contract has led to the actual engineering costs of the construction enterprises increased, the construction period extended, and even the loss caused by the power construction enterprises. A compensation method is proposed . Explain the causes of the claims, the factors affecting the success of the claims and the processing of the claims. According to the case analysis, the construction unit must strengthen the claims management so as to recover the losses to the maximum extent.