论文部分内容阅读
1983年11月国家地震局对华北井网组织验收后,山西省部分井被列为缓验井,今年国家局将于第四季度在华南组织井网验收。为争取将我省的这批缓验井纳入国家井网,省局子6月30日至7月6日在昔阳召开了验收预备会。会上,缓验井所在地的地、市地震局长或观测井的业务负责人根据验收要求,对井孔本身的质量及所处的构造位置、井房和观测条件与观测资料等情况等作了介绍。通过讨论,肯定了成绩。指出了存在问题,对文字报告提出了要求,提出了比例尺和图,隔规格的统一问题。另外,还对地震地下水观测员进行了系统的业务培训。培训采取讲课形式,最后还进行了考试,参加
After the acceptance of North Well Network by the National Seismological Bureau in November 1983, some wells in Shanxi Province were listed as slow wells. This year, the State Bureau will organize well screens in southern China this year for acceptance. In order to win the batch of wells in our province into the national well network, the provincial bureau held a preparatory meeting for acceptance in Xiyang from June 30 to July 6. At the meeting, the place where the pit was located, the head of the city earthquake director or the observer well made a check on the quality of the borehole, the location of the well, the well room, the observation conditions and the observation data according to the acceptance requirements Introduction. Through discussion, affirmed the results. Pointed out the existing problems, put forward the requirements for the text report, put forward the scale and the diagram, separated the specifications of the unity problem. In addition, we conducted systematic business training for earthquake groundwater observers. Training took the form of lectures, and finally conducted an exam to participate