论文部分内容阅读
沈阳油田高凝油的开采,采用水力活塞泵采油工艺,其动力液系统的高压管汇是关键设备之一。目前的高压管汇全部为国外产品,花费了大量外汇。自1987年底,辽河油田设计院与哈尔滨机械研究所协作,共同开发研制国产的高压管汇。在沈阳采油厂的紧密配合下,于1988年12月14日在沈采9号站进行了连续近800h、注入动力液5000m~3的试运转。通过现场生产试运考核证明,该产品工作性能稳定,密封性良好,调节灵活,精确度能达到高温高压条件下的定量要求,满足水力活塞泵采
Shenyang Oilfield high pour point extraction, the use of hydraulic piston pump production process, the power system of high pressure manifold is one of the key equipment. The current high-pressure pipe all foreign products, spent a lot of foreign exchange. Since the end of 1987, Liaohe Oilfield Design Institute and Harbin Institute of Machinery collaboration, joint development and development of domestic high-pressure manifold. In close cooperation with the oil production plant in Shenyang, on December 14, 1988 at Shen She 9 Station for nearly 800h continuous injection of power fluid 5000m ~ 3 commissioning. Through on-site production of test transport examination proved that the product performance and stability, good sealing, flexible regulation, accuracy can reach the quantitative requirements under high temperature and pressure conditions to meet the hydraulic piston pump