国外某些大型水轮发电机组的安装

来源 :水电机电安装技术 | 被引量 : 0次 | 上传用户:tw2008hr
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
国外水轮发电机组的安装情况报导的材料不多,现就找到的几座大水电站的一些资料介绍如下,供参考。近代大水电站的机组安装特点是:多台机组同时安装,流水作业;大型机组的部件受运输条件的限制,需要分瓣制造,在现场进行装配和焊接;现场要设置装配用的大型设备;为了保证运行质量从设计到安装都要经过科学试验,按规程严格验收。 The installation situation of foreign hydro-generating units reported little material, and now found some of the several large hydropower plant data are introduced below, for reference. Modern large hydropower station unit installation features are: more than one unit at the same time installation, assembly line; large unit of the parts subject to transport conditions, the need to manufacture sub-valve assembly and welding at the scene; site to set the assembly of large equipment; in order to To ensure the quality of operation from design to installation have to go through scientific tests, according to strict inspection procedures.
其他文献
呼吸停止时间超过 2 0s称呼吸暂停 ,早产儿无明显原因的呼吸暂停称为早产儿原发性呼吸暂停。呼吸暂停是一种严重现象 ,如不及时处理 ,可因缺氧引起脑损伤。我科自1990年 3月至
将CDIO工程教育理念引入到中等职业学校动漫专业课程的教学过程,提出了适应于动漫专业的CDIO课程体系模型。论述了课程教学实践中,以“项目为载体,技能训练为主体”的教学理
以人为本作为科学发展观的核心,对高职院校的学生管理工作提出了新的要求,学生发展事务议事会在激发学生的民主参与意识和推进学校民主管理方面发挥了重要作用。四川建院“以
现代汉语中有许多“V了个VP”的结构式。该文从胡裕树、范晓等人的三个平面理论,尤其是句法平面的角度,综合前人的研究成果,对“V了个VP”进行了探讨。 In modern Chinese t
修辞沟通分离的基本功能与翻译作为沟通不同语言文化的桥梁作用不谋而合。作为跨语言、跨文化的交际活动,翻译也可以被视为一个说服行为,一种修辞活动。不论翻译的预期功能是
<正>训诂体式是指训诂著作的体裁和格式。注解一部书,首先要考虑采用何种体式为宜,而体式的选定,主要依据注解的对象、角度和目的等等。也就是说,被注解的书籍不同,注解时所
近年来由于建筑市场竞争日益激烈,招投标压级压价,企业获利空间越来越小,加之企业自身对成本疏于管理,个别人甚至误认为成本管理仅是财务人员管理范畴,事不关己的错误认识,只
西斋堂水库位于北京市郊区永定河支流清水河上,采用粘土斜墙坝挡水,库容5,320万立方米。该库于1970年开工,1974年建成蓄水。1978年汛前,在土坝上游坝坡发现二处塌坑,1978年1
为了解适龄儿童计免接种合格情况 ,进一步提高计免工作质量 ,我们对 1990年~ 1998年出生儿童七苗接种合格率进行了调查分析 ,现报告如下 :1 材料来源和方法材料来源 :本街道