国外水轮发电机组的安装情况报导的材料不多,现就找到的几座大水电站的一些资料介绍如下,供参考。近代大水电站的机组安装特点是:多台机组同时安装,流水作业;大型机组的部件受运输条件的限制,需要分瓣制造,在现场进行装配和焊接;现场要设置装配用的大型设备;为了保证运行质量从设计到安装都要经过科学试验,按规程严格验收。
The installation situation of foreign hydro-generating units reported little material, and now found some of the several large hydropower plant data are introduced below, for reference. Modern large hydropower station unit installation features are: more than one unit at the same time installation, assembly line; large unit of the parts subject to transport conditions, the need to manufacture sub-valve assembly and welding at the scene; site to set the assembly of large equipment; in order to To ensure the quality of operation from design to installation have to go through scientific tests, according to strict inspection procedures.