论文部分内容阅读
近年来,中国在对外工程承包领域取得了显著成效,业务规模持续扩大,以EPC为代表的总承包模式越来越多,实物支付模式也不断增加。但与此同时,中国企业在“走出去”的国际化过程中也存在诸多亟待解决的操作问题。本文拟对中国企业在承建国际工程过程中,因设备材料运输而产生的保险问题予以探讨,以期对中国相关企业有所启示。一、设备材料在对外工程中的性质与作用在国际工程总承包(EPC)
In recent years, China has made remarkable achievements in the field of foreign project contracting. Its business scale has been continuously expanded. The general contracting model represented by EPC has been more and more and the mode of payment in kind has been constantly increasing. However, at the same time, Chinese enterprises have many operational problems to be solved during the process of internationalization of “going global”. This article intends to discuss the insurance issues arising from the transportation of equipment and materials during the construction of international projects by Chinese enterprises in the hope of enlightening the relevant enterprises in China. First, the nature and role of equipment materials in external engineering In the International Engineering General Contracting (EPC)