1988年水电基本建设和前期工作任务安排

来源 :水力发电 | 被引量 : 0次 | 上传用户:yygyogfny
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我国的水电建设,1987年在任务重、困难多的情况下,经过广大职工的努力,取得了很大成绩,达到了水电年装机总容量(203万kW)、一个水电站年装机容量(葛洲坝75万kW)和一个水电站年装机台数(葛洲坝6台12.5万kW机组)三个历史最高水平;同时有5座大中型水电站胜利截流,其它在建水电工程都在紧张施工,进展比较顺利。据了解,截至去年年底,我 In 1987, with heavy tasks and more difficulties, China’s hydropower construction achieved great success through the efforts of a large number of workers and reached the total annual installed capacity of hydropower (2.03 million kW), the annual installed capacity of a hydropower station MW) and a hydropower station installed capacity (Gezhouba 6 125,000 kW units) the three highest levels in history; at the same time there are five large and medium-sized hydropower station victory interception, other hydropower projects under construction in the tension construction, the progress is relatively smooth. It is understood that, as of the end of last year, I
其他文献
迎接香港回归扩大商业开放中商企业集团总经济师赵尔烈我国国有商业的改革与发展,已经到了一个历史性的关键时刻,推进企业改革,适应市场经济体制,是根本出路。香港回归,为国有商业
信息技术的飞速发展给我们的生活带来了日新月异的变化。传统的英语教学模式受到了巨大的挑战。将信息技术应用到日常的英语教学中,改变传统的英语教学模式,将有助于更好地完
对供销社推进农业产业化问题的探讨吴建社供销社是农民的合作经济组织,又承担国家赋予的某些经济社会任务,特别是担负着为“三农”提供系统化社会服务的重任,在推进农业产业化进
木兰山低温高压变质岩中的石英脉及其围岩的矿物组成、变质结构和界面特征的光学显微镜和电子探针研究表明,该石英脉为同构造重结晶脉,经历过低温高压变质作用,其变质温度压
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
李贵鲜同志强调指出:治理淮河,一要采取工程措施,二要采取生物措施,而且要把二者紧密结合起来“治好淮河,是发展安徽经济的潜力所在,是沿淮人民脱贫致富的希望所在。对国家
1985年东北地区由于受到几次台风的影响,普遍降下暴雨或大暴雨,使辽宁、吉林、黑龙江三省的某些江河洪水泛滥,城乡受淹,给人民生命财产和东北地区的国民经济建设,造成了一定
情感过滤因素是影响外语教学效果的重要因素之一。中等职业学校教育在教育体制中不同于普通高中教育,针对中职学生的具体学情,在考虑到情感因素影响的基础上,教师应该具备不
由国家科委、中国科学院资助的我国第一座波力电站珠江口千瓦级波力试验电站主体混凝土工程——气室岩坑开挖和气室混凝土结构已完工,电站施工将进入最后岩坎暴破阶段,预计1