杭州铁路客站综合楼转换层施工技术

来源 :浙江建筑 | 被引量 : 0次 | 上传用户:chyenu
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 工程概况 杭州铁路客站综合楼工程是铁道部、浙江省的重点工程,也是杭州市铁路枢纽工程建设中的主要项目。总建筑面积63135m~2,建筑高度71.55m,总建筑层数18层(地下1层)。本工程为现浇钢筋混凝土框架剪力墙结构,共分为A、B、C、D、E五个区。该工程C区为结构的重点和难点部位,在?、?、(16)(19)轴交接处为4根截面为2m×2m预应力钢筋混凝土柱K_zo ,从地下室一直延伸到十五层转换层。第十五 1 Project Overview Hangzhou Railway Station Comprehensive Building Project is a key project of the Ministry of Railways and Zhejiang Province, and is also a major project in the construction of Hangzhou Railway Hub Project. The total construction area is 63135m~2, the building height is 71.55m, and the total building layer is 18 layers (1st floor underground). This project is an in-situ reinforced concrete frame shear wall structure and is divided into five zones: A, B, C, D, and E. The project C area is the key and difficult part of the structure. At the junctions of the ?,?, (16)(19) axes, there are four prestressed concrete columns K_zo with a section of 2m × 2m, extending from the basement to the fifteenth floor. Floor. fifteenth
其他文献
这是一座江南水乡古城。2004年,她被评为中国最具活力的城市之一。这里有美丽的太湖、壮阔的长江、通达的运河、逶迤的惠山、肥沃的平川……一曲《太湖美》带给人们“城在山
在北方,一般住宅楼工程的外墙,由于保温的要求,其厚度多为370mm,厨房与阳台之间的墙厚也不例外。多数厨房与阳台之间均采用双层内外开门连窗,窗所占的面积可达0.35m~2左右,
老年多器官功能衰竭(MOFE),病死率极高,尤其在高海拔地区[1]。因此,探讨其发病特点及护理要点是降低病死率的关键。我院对30例入住重症监护室(ICU)的MOFE患者进行了护理观察,
3月10日下午3时,国务院总理朱镕基步入人民大会堂装修一新的广东厅,笑容可掬地对与会代表说:“广东厅装修以后我没来过,进来以后感觉到焕然一新,装修得庄严、漂亮、淡雅、朴
随着神经基础科学和技术学科的进展以及新知识在诊断和治疗上的应用,目前的神经病学是历史上最活跃和最出成果的时期。本文简介本科近十年来几个重要的进展。计算机断层摄影
强直—阵挛性癫痫苯妥英: (一)适应症:苯妥英适用于多数强直——阵挛性癫痫状志患者,其理由是:控制强直——阵挛性癫癎状态极为有效;静脉注入负荷剂量能迅速达到治疗作用且
因为脑血管障碍尤其是脑血栓形成自然缓解是常有的事,所以在脑血管障碍时确认脑细胞活化剂的疗效甚为困难。因此有的学者怀疑脑细胞活化药物的疗效,作者有鉴于此,对该药的疗
近年来仿古建筑不断增多。它们色彩纷呈,檐牙高耸,圆柱支顶,具有独特的东方风格,在世界建筑界享有盛誉。但是由于种种原因,最能表现其特色的彩色面层总是保持不长时间,在短
战争的目的是“保存自己,消灭敌人。”战斗必有伤亡,但每个军事指挥员总希望用最小的流血代价换取最大的战果。指挥员如能懂得一些伤亡原理,并使用于训练和战斗实际,是会有
1980年11月澳大利亚威尔士亲王医院核医学部主任IPC Murray教授来华访问期间,在京作了“核医学在儿科中的应用”、“核心脏病学”、“骨扫描”、“甲状腺疾病研究”等学术报