论文部分内容阅读
This paper presents the two-machine flowshop group scheduling problem with the optimal objective ofmaximum lateness. A dominance rule within group and a dominance rule between groups are established. Thesedominance rules along with a previously established dominance rule are used to develop a heuristic algorithm.Experimental results are given and analyzed.