论文部分内容阅读
路基施工控制在道路建设中十分重要,尤其是土方路基施工过程中这一点起到十分关键的作用。道路建设的路线长、施工量大,在工程建设的过程中地质情况十分复杂,可能受土质和地理位置、自然环境的影响在施工的过程中导致土方的含水量过高或是过低,无论高低对于工程建设的施工增加许多难度,对于工程的质量问题也有着很大影响,所以为了提高道路工程的建设质量,面对此问题必须要找寻合理的有效的应对措施,本文从现在道路建设施工的实际情况出发,阐述路基土方在施工的过程中对于含水量控制采用的措施,希望对同行业从事人员有所帮助,在技术上有所交流。
Subgrade construction control in the road construction is very important, especially in the process of earthwork embankment play a very crucial role. The route of road construction is long and the construction volume is large. The geological conditions in the process of project construction are very complicated and may be affected by soil quality, geographical location and natural environment. During construction, the water content of earthwork will be too high or too low. Therefore, in order to improve the quality of road construction, we must find a reasonable and effective response to this problem. This article from the construction of road construction Starting from the actual situation, elaborated the subgrade earthwork in the process of construction for the water content control measures taken, hoping to work in the same industry personnel, technically exchange.