二滩水电站主体土建及导流工程国际招标文件编制工作自1987年第四季度正式开展以来,已取得了可喜的成果,现报导如下。一、施工规划 (一)施工分标二滩水电站位于高山峡谷之中,坝区场地狭小,枢纽布置紧凑,施工布置困难,各建筑物施工干扰严重。通常在这种情况下不宜分标建设,以使承包商充分利用现有的场地,统一
The preparation of the international bidding documents for the main civil works and diversion works of Ertan Hydropower Station has made gratifying achievements since it was officially launched in the fourth quarter of 1987 and the report is as follows. I. Construction Planning (I) Construction Sub-standard The Ertan Hydropower Station is located in a mountain valley. The dam site has small site, compact layout of the hub, difficult construction layout and serious interference with the construction of various buildings. Normally in this case should not be divided construction, so that the contractor to make full use of existing venues, unified