论文部分内容阅读
苏格兰福斯桥(Forth Replacement Crossing),坐落于英国苏格兰爱丁堡附近福斯海湾。该桥总长度2100米,分为主通航区与引桥部分,引桥为连续梁,主通航区部分为三塔四跨双索面、钢硂叠合梁斜拉桥,是目前英国第一大斜拉索桥。该桥箱梁宽度30.28米,高4.5米。该项目制造标准按欧标BS EN 1090-2:2008执行。上海振华重工(集团)股份有限公司承接了该项目所有主跨钢箱梁及临时塔的详图设计、材料采购、制造、涂装与运输,钢结构制造总吨位达3.2万吨。
Forth Replacement Crossing, Scotland, located in the Gulf of Forth, near Edinburgh, Scotland. The total length of 2100 meters of the bridge, is divided into the main navigation section and lead the bridge part of the approach bridge for the continuous beam, the main navigation area part of the three towers of four span double cable plane, steel 硂 composite beam cable-stayed bridge is the United Kingdom is the largest oblique Cable Bridge. The width of the bridge box girder 30.28 meters, 4.5 meters high. The project manufacturing standards according to the European standard BS EN 1090-2: 2008 implementation. Shanghai Zhenhua Heavy Industries (Group) Co., Ltd. undertook the detailed design, materials procurement, manufacturing, painting and transportation of all the main steel-steel box girders and temporary towers of the project. The total tonnage of steel structures was 32,000 tons.