论文部分内容阅读
1 概述深圳港盐田港区三期工程位于深圳市东部的大鹏湾内,与正在运营的一、二期工程成90°直角相交.有前沿水深为-16m 的集装箱专用泊位4个,即6号~9号泊位,可停靠目前世界上最大的装箱量达8000 TEU的集装箱运输船,并预留浚深至-17.0m,码头前沿线长1400m。业主为盐田国际集装箱码头有限公司。该公司为中港合资企业,中方为盐田港集团公司,港方为香港和黄港务,由港方控股。总投资60余亿元。
1 Overview Shenzhen Port Yantian Port Phase III Project is located in Dapeng Bay in the eastern part of Shenzhen City and intersects with the first and second phases of operation at a right angle of 90. There are 4 container berths with a leading water depth of -16m, ~ Berth 9, it is possible to stop at the largest container shipping container with a capacity of 8,000 TEU in the world and reserve a depth of -17.0m and a length of 1400m in front of the wharf. The owner is Yantian International Container Terminal Co., Ltd. The company is a Sino-Hong Kong joint venture, the Chinese side is Yantian Group Corporation, the Hong Kong side of Hong Kong and Huanggang Port, controlled by the Hong Kong side. A total investment of more than 60 billion yuan.