论文部分内容阅读
入冬以来,由于各级领导重视,在复堤防汛方面取得了很大成绩。特别是农业方面实现合作化以后,农民群众生产积极性空前高涨,认识到圩堤是保障农业增产的命脉,迫切要求修好水利,以保证丰收,因而在复堤堵口工程中,表现了高度的社会主义劳动热情,加快了工程进度,工程质量上,大部分做到层土层夯,踩马跥土,有的地区并采取了抽槽翻筑,截止渗漏,防止汛期脱坡的危险;有些地区对历史性险段还作了根本性的加固工程;一般的都加宽培厚。永修县的堤防今年普遍加高0.3公尺到2.1公尺,重点圩高于55年22.31公尺最高洪水位标准。但也不能忽视,个别地区复堵工程,截至目前止进度仍很迟缓,没有竣工;部分地区有膛腰缩脚,夯工不实发裂下沉
Since winter, due to the attention of leaders at all levels, flood control in the dike has made great achievements. In particular, after the realization of co-operation in agriculture, the production enthusiasm of the peasants is unprecedentedly higher. It is recognized that the dike is the lifeblood of ensuring agricultural production and urgently requires the water conservancy to be repaired so as to ensure a good harvest. Therefore, a high degree of social Labor enthusiasm has accelerated the progress of the project. In terms of project quality, most of the projects have achieved the effect of tamping soil and stepping on the land of horses and earth and in some areas and adopting the methods of pumping troughs to prevent seepage and prevent the danger of falling off during the flood season. Some The region has also made substantial reinforcement of historical risk sections; generally, it has broadened its training. Yongxiu embankment this year generally increased 0.3 meters to 2.1 meters, the key fair is higher than the 55-year maximum flood level of 22.31 meters. However, it can not be overlooked that the project of plugging in some areas has still not been completed until now. The progress has been slow in some areas.