论文部分内容阅读
“水利化、电气化、农业生产机械化、没有文化不能化”。这是吕庄水库工地实现无盲后广大群众对大闹文化革命的评语。工地职工,在党的关怀培养下,随着技术革新和技术革命高潮的到来,紧密结合水库建设的高工效、高质量掀起了一个轰轰烈烈,又扎扎实实的群众性的扫盲学习和业余教育运动,广大民工发挥了顽强的学习和刻苦钻研的精神,在六个月施工中,扫除了全部文盲4,000余人,全体民工都学会了汉语拼音,实现了无盲工地。同时普及初级教育入学人数达24,000人,并有3,000人由业余高小上升到业余中学。吕庄水库工地能出现这样一个群众性的文化大革命高潮,完全不是偶然的,它是水利建设事业高速度发展的产物,是大跃进新形势的需要,是广大农民群众文化翻身的要求。那么文化革命是如何开展起来的呢?具体来说有以下几点:
“Water conservancy, electrification, mechanization of agricultural production, no culture can not be ”. This is a comment made by Lvzhuang Reservoir after the mass blindness of the mass cultural revolution without blindness. With the advent of technological innovation and the climax of the technological revolution, workers and staff at construction sites set off a vigorous and solid mass literacy learning and amateur education movement in close connection with the high work efficiency and high quality of reservoir construction under the care of the party. In the six-month construction period, more than 4,000 illiterates were wiped out by all migrant workers. All migrant workers learned Chinese pinyin and realized no blind work sites. At the same time, the number of people enrolled in primary education has reached 24,000, and 3,000 people have gone from amateur highs to amateur secondary schools. It is no accident that such a mass climax of the Cultural Revolution can occur in the Lvzhuang reservoir site. It is a product of the rapid development of water conservancy construction, a requirement of the new situation of the Great Leap Forward, and a requirement for the peasants’ mass culture to turn over. So how is the cultural revolution carried out? Specifically, the following points: