1 引言 泗阳第二抽水站(以下简称二站)是江苏省利用世行贷款加强灌溉农业项目,它与泗阳一站、泗阳闸一起构成江苏省江水北调第四梯级、淮水北调第一梯级。二站安装设计扬程6.0m、单机流量33m~3/s的立式轴流泵机组2
1 INTRODUCTION Siyang No.2 Pumping Station (hereinafter referred to as “the second station”) is a project of strengthening irrigation agriculture by World Bank loan in Jiangsu Province. It forms the fourth step of Jiangsu Jiangbei northward transfer together with Siyang one station and Siyang gate, Adjust the first step. Two stations installed design lift 6.0m, stand-alone flow 33m ~ 3 / s vertical axial flow pump unit 2