针对山区地区来说,高空和大风对斜拉桥索塔施工影响大,同时斜拉桥对于索道管安装控制精度要求高。文章通过结合武佐河特大桥工程中的斜拉桥施工实例,系统地分析了斜拉桥施工特点,同时针对斜拉桥施工难点展开探讨,总结出可行的施工技术措施,为同类工程提供参考实例。
For mountainous areas, high-altitude and strong winds have a great influence on the construction of cable-stayed pylons, and cable-stayed bridges require high control precision for cableway installations. By combining the construction examples of cable-stayed bridges in the Wuzuo River Super Large Bridge project, this paper systematically analyzes the construction characteristics of the cable-stayed bridge, discusses the construction difficulties of the cable-stayed bridge, summarizes the feasible construction technology measures, and provides reference examples for the similar projects .