依托前滩中粮壹号公馆项目,对半套筒灌浆连接技术的难点进行了分析。通过方案的比选与优化,最终使用了全新的钢套板定位技术。通过工程实践表明,采用这一全新的钢套板定位技术,保证了工程进度,确保了工程的质量,为今后类似的工程提供了借鉴。
Relying on the front beach COFCO One mansion project, the semi-sleeve grouting connection difficulties were analyzed. Through the program selection and optimization, the final use of the new steel plate positioning technology. The engineering practice shows that adopting this new steel plate positioning technology ensures the progress of the project and ensures the quality of the project, thus providing reference for similar projects in the future.