论文部分内容阅读
引黄工程为全封闭地下渠通.如何监测这种特长隧道的水位,成为该工程的一项重大技术难题.这一难题经过太原工业大学教授马福昌近两年的研究,有了突破性进展,日前,通过了国内专家的鉴定.
The Yellow River Diversion Project is a fully closed underground canal, and how to monitor the water level of such a long tunnel has become a major technical challenge for the project, which has made breakthrough progress through the research conducted by Professor Ma Fuchang of Taiyuan University of Technology in recent two years. Recently, passed the appraisal of domestic experts.