论文部分内容阅读
华北地区第一座火力发电厂——太原第一热电厂,已度过了35个春秋。到今天,它拥有汽轮发电机7台,燃煤锅炉10台,容量18.6万瓩,锅炉总蒸发量1455吨/时,具有年发电量12亿瓩时,供热量620万十亿焦耳的生产能力,同时可向化工区供生产用蒸汽300吨/时,软化水100吨/时,冬季采暖用热水500吨/时。是山西省电力系统的调频电厂之一。1955年,该厂总产值795万元,发电量13117万瓩时,全员劳动生产率13616元/人。到了1989年,总产值已达7615万元,发电量14.125亿瓩时,供热量647.52万千亿焦耳,全员劳动生产率38465元/人。这些数据,向人们展示了一电厂的巨大变化,记录着一电厂35年的发展历程。
The first thermal power plant in North China, Taiyuan No. 1 Thermal Power Plant, has spent 35 years. Today, it has 7 turbo-generators, 10 coal-fired boilers with a capacity of 186,000 troy bers, and a total boiler evaporation of 1455 tons/hour. With an annual power generation of 1.2 billion troy bers, the heat supply capacity is 6.2 billion kilojoules. The production capacity can also supply 300 tons of steam for the production area, 100 tons of softened water per hour, and 500 tons of hot water for heating in the winter. It is one of the FM power plants in Shanxi Province’s power system. In 1955, the total output value of the plant was 7.95 million yuan, and when the power generation capacity was 131.17 million, the total labor productivity was 13,616 yuan/person. By 1989, the total output value had reached 76.15 million yuan, and the power generation amounted to 1.4125 billion baht. The heat supply amounted to 6.475 billion kilojoules and the total labor productivity was 38465 yuan/person. This data shows people a huge change in a power plant and records the 35-year history of a power plant.