论文部分内容阅读
在批林整风运动的推动下,在工厂党委关于“狠抓老厂技术改造,改变生产条件,挖掘生产潜力,提高生产水平”的方针指导下,铸钢车间在厂内各兄弟单位的协助下,于1973年6月制成了一台六抛头两喷枪的喷、抛两用清砂设备。该设备清理铸钢件的生产率达6吨/时。它的使用,改变了车间风铲清砂的生产落后面貌,符合生产发展的要求,并改善了清砂工人的劳动条件。这台设备是铸钢车间三结合技术小组,在学习大连、沈阳、抚顺等兄弟工厂经验的基础上,结合自己的生产特点,尽量采用先进的技
Under the guidance of the campaign of rectifying forests and rectification, with the guidance of the party committee of the factory under the guideline of “relying on the technological transformation of the old factory, changing the production conditions, taping the potential of production and raising the level of production”, the steel-making workshop with the help of various brothers and units in the factory , In June 1973 made a six throwing two spray gun spray sand throwing sand with both equipment. The device clean cast steel production rate of 6 tons / hour. Its use has changed the backwardness of the production of wind-shovel sand in workshops, meets the requirements of production and development, and improves the working conditions of sand-cleaning workers. This equipment is a combination of steel casting workshop three technical team, learning Dalian, Shenyang, Fushun and other brothers factory experience, based on their own production characteristics, as far as possible the use of advanced technology