文章结合通黄路立交主线桥EJ,和H 3个匝道桥体外预应力施工组织方案,详细地阐述了钢箱连续梁+体外预应力结构的施工组织方案。
Combined with the construction plan of external prestressing of EJ and H 3 ramp bridges in the main Huangqiao interchange, the construction organization scheme of continuous steel box + external prestressed structure is elaborated.