为加速实现矿山坑道钻探机械化,冶金部地质研究所、武钢矿山指挥部和大冶铁矿共同进行坑道金刚石绳索取芯钻进技术的研究与试验工作.1982年,冶金部地质研究所设计了YS47-Ⅱ型坑道绳索取芯钻具及绳索取芯绞车、专用水接头等附属装置,1983年3月在武钢大冶铁矿尖林山矿区坑道内进行生产试验.试验采用的钻机为钻石-300型全液压金刚石岩芯钻机.到5月份为止,完成了一个300.05米的90°垂直钻孔和一个136.06米的水平钻孔,第三个水平试验钻孔正在施工,孔深已近百米. 绳索取芯钻杆采取直接连接形式,不需要钻杆接头,从而减少了加工工作量和费用.经过300米孔深的钻进
In order to accelerate the mechanization of mine tunnel drilling, the Ministry of Metallurgy, Institute of Geology, Wuhan Iron and Steel Mining Command headquarters and Daye Iron Mine tunneling diamond core coring drilling technology research and experimental work in 1982, the Ministry of Metallurgical Institute of Geology YS47 -Ⅱ type tunnel rope coring drilling tools and rope core winch, special water joints and other ancillary devices, in March 1983 in Wusong Daye Iron Mine Shaolin mining pit tunnel production test. Test rig used for the Diamond -300 type Fully hydraulic diamond core drilling rig As of May, a 90 ° vertical borehole of 300.05 meters and a horizontal bore of 136.06 meters were completed and a third horizontal test borehole was under construction with a hole depth of nearly 100 meters. Core drill pipe to take the form of direct connection, do not need to drill pipe joints, thereby reducing the processing workload and costs.After drilling 300 meters deep