构皮滩二级升船机基础为大体积混凝土,由于浇筑期处于高温月份,降温幅度大、保温难度高,混凝土温度控制成为其施工的关键。为确保升船机施工期对混凝土浇筑采取的施工条件和方法可行,在充分考虑施工环境气候变化、混凝土材料热学力学性质和人工降温保温措施的基础上,基于有限单元法采用ANSYS软件对其大体积混凝土浇筑全过程进行了三维仿真计算,分析其施工期非稳定温度场及应力场的分布变化规律,并提出相应的温控措施,可为类似工程提供重要参考。
The foundation of Goupitan Beach two-stage shiplift is mass concrete. Since the pouring period is in the high temperature month, the cooling rate is large and the heat preservation is difficult, the concrete temperature control becomes the key point of its construction. In order to ensure the construction conditions and methods of concrete pouring during the construction period of lift ship are feasible, on the basis of full consideration of climate change in construction environment, thermomechanical properties of concrete material and artificial cooling and thermal insulation measures, ANSYS software Volume concrete pouring the whole process of a three-dimensional simulation calculation, analysis of its construction period of non-steady temperature and stress field distribution changes, and put forward the corresponding temperature control measures for similar projects provide an important reference.