2008年初,中国南方大部分地区遭遇历史罕见的雨雪冰冻自然灾害,电网大面积受损,重建电网就成了春节前后最为紧迫的事情之一。2月13日,国务院发出通知强调下一阶段抗击冰雪灾害将由应急抢险抗灾转入全面恢复重建,首要任务就是要以电网恢复重建为重点,抓紧修复基础设施。全面展开受损高压网架的修复工作,3月底前完成修复、重建各受灾地区电网设备工作,并恢复电网正常运行。电网重建的当务之急是恢复500千伏电网,后续的220千伏、110千伏及城
At the beginning of 2008, most of southern China suffered a natural disaster of rain, snow and ice that scarcely occurred in history and the power grid was damaged in a large area. Rebuilding the power grid has become one of the most pressing things before and after the Spring Festival. On February 13, the State Council issued a circular stressing that the next phase of the fight against snow and ice disaster will be transformed from emergency rescue and disaster relief to full recovery and reconstruction. The primary task is to focus on restoration and reconstruction of power grids and pay close attention to the restoration of infrastructure. We will carry out the restoration of damaged high-voltage grids in an all-round way and repair will be completed before the end of March to rebuild the power grid equipment in all the affected areas and restore the normal operation of the grid. The urgent task of power grid reconstruction is to restore 500 kV power grid, followed by 220 kV, 110 kV and the city