论文部分内容阅读
(一) 前言黑潮合作调查(CSK)是在1965年开始的。第一阶段两年已在1967年完成,第二阶段另两年也在1969年六月结束。作者根据调查船“阳明”号在第一阶段四个航次的调查资料,对台湾东部海区三个断面黑潮海流的流速和水量输送的变化进行了研究。作者在研究中使用了动力计算法对海流的若干重要特性作了检查。本文为第一次黑潮合作调查讨论会(火鲁奴
(I) Preface The Kuroshio Cooperation Survey (CSK) started in 1965. The first two years were completed in 1967 and the second two years ended in June 1969. Based on the investigation data of the survey vessel Yangming in the first phase of four voyages, the author studied the changes of velocity and water transport in the three sections of the Kuroshio current in the eastern part of Taiwan. The authors used kinetic calculus in the study to examine several important characteristics of ocean currents. This article is the first seminar on Kuroshio cooperation survey