浅谈双悬臂施工钢梁运输及存放措施

来源 :公路交通科技(应用技术版) | 被引量 : 0次 | 上传用户:fengliming33645
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
灌河大桥主桥标准梁段组合梁采用双悬臂安装施工,通过地面运输、后场存放、垂直运输以及桥面运输将钢梁送至桥面吊机后方;项目部自主创新,设计并加工喂梁平台形成钢梁上桥通道,并在钢梁运输及存放过程中采取有效措施,既满足钢梁运输及存放要求,又提高了施工效率,为后续双悬臂施工钢梁运输提供了新方法。 The girder bridge main beam standard beam section composite beam with double cantilever installation construction, through the ground transportation, storage at the backcourt, vertical transport and bridge transport to the rear of the bridge crane; project department innovation, design and processing The beam platform forms the steel beam upper bridge passage, and takes effective measures during the transportation and storage of the steel beam, which not only meets the requirements of steel beam transportation and storage, but also improves the construction efficiency and provides a new method for the subsequent steel beam transportation with double cantilever construction.
其他文献
目的 探讨缺氧、缺血对新生鼠大脑组织天冬氨酸特异酶切的半胱氨酸蛋白酶 3(简称caspase 3)活性的影响及意义。方法 选择 7d龄Sprague Dawley大鼠 33只 ,结扎左侧颈总动脉