论文部分内容阅读
通过水力学模型试验,研究一种新型尾水洞变顶高尾水洞在各种下游水位时的水力工作特性.试验结果表明,变顶高尾水洞能够取代尾水调压室,且保证调保参数满足规范要求.
Through the hydraulic model test, the hydraulic characteristics of a new tailrace tunnel with a tailrace tunnel at various downstream water levels are studied.The experimental results show that the tailing tunnel can replace the tailrace surge chamber, The parameters meet the specifications.