大型冷却塔桩基缺陷与补强对结构影响的分析

来源 :特种结构 | 被引量 : 0次 | 上传用户:sdngam
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
某电厂大型冷却塔桩基由于不当的截桩处理,导致约30%的桩基被截断了25%的桩长。采用整体有限元方法分析了截桩所导致的基础不均匀沉降及其对混凝土塔壳受力状态的影响,以及自重、沉降、风组合作用下的桩基截断区的长短桩效应。结合冷却塔结构的受力特点,提出了对截桩较为集中的区域采用局部补桩方案进行加固处理,并对补桩后的塔壳、基础等受力状态进行了分析,结果表明补桩方案合理可行。 A large cooling tower pile in a power plant was cut off by 25% of the pile length due to improper cut pile handling. The overall finite element method is used to analyze the uneven foundation settlement caused by pile cutting and its effect on the stress state of concrete tower, and the effect of pile length and pile length under pile foundation under the action of self-weight, settlement and wind. Combined with the stress characteristics of the cooling tower structure, it is proposed to reinforce the partial pile replacement plan in the area where the pile is concentrated, and the stress state of the tower shell and foundation after pile replacement is analyzed. The results show that the pile replacement plan Reasonable and feasible.
其他文献
举世瞩目的党的十八届三中全会已于11月12日胜利闭幕.rn全会审议通过的《中共中央关于深化改革若干重大问题的决定》是一篇高举改革旗帜深化推进改革的大文章,同时也是继往开
针对光伏电站输出功率时间序列表征出来的周期性非平稳特性,提出一种基于多尺度小波分解和神经网络相结合的光伏功率预测方法。将光伏电站输出功率时间序列在不同尺度上进行小
新型预制钢筋混凝土梁柱抗震节点采用五环螺旋箍、一笔箍和在套筒中灌注无收缩高强砂浆的方法制作。通过对这一新型结构进行抗震性能试验和理论研究,为预制混凝土抗震节点设
针对黄河龙羊峡光伏电站与水电站联合运行短期调度的可行性问题,建立调峰能力最大数学模型,提出基于模拟优化思想的模型求解方法.通过反推机组的最大技术出力论证水光互补对
语文一直被视为高中教学之中基础性科目,是学生不断加强文化底蕴以及增强交流能力的必备工具.因此,在语文教学开展过程中,深化语文知识能力至关重要.目前,针对高中语文教学来
目的观察核转录因子-κB p65(NF-κB p65)和低氧诱导因子-1α(HIF-1α)在癫痫持续状态(status epilepticus, SE)大鼠海马神经元损伤中的作用,探讨NF-κB p65对HIF-1α的调控作用。方法选择110只成年雄性SD大鼠,随机数字表法分成7组:生理盐水对照组15只、假手术组15只、SE模型组20只、NF-κB特异性抑制剂吡咯烷二硫代氨基甲酸盐(PDTC)组1
系统研究了CuZnAlMnNi记忆合金在低温下的相变特性,发现该合金淬火到马氏体态后,在继续冷却过程中,接着发生马氏体组织(M)向X-相的转变;在随后的加热过程中首先发生X→M转变,
自2013年9月习近平主席提出共建“丝绸之路经济带”以来,“丝绸之路经济带”建设引起了中亚国家以及国际社会的强烈反响,其对华合作的积极性空前高涨.本文结合新疆实际情况,
随着社会不断发展进步,公路事业对地方经济发展的作用越来越重要.宁夏作为中国内陆省份,近年来公路事业取得了长足进步.本文将以宁夏南部山区固原市为例,分析公路事业对宁夏