论文部分内容阅读
根据1985年九号台风期间的风场,推算出北海船厂防波堤头处最大波要素,结合堤头受损情况进行初步分析,并提出几点看法。
According to the wind field during the typhoon on the 9th in 1985, the maximum wave element of the breakwater at Beihai Shipyard is deduced. Based on the damage of the dikes, a preliminary analysis is made and some opinions are put forward.