论文部分内容阅读
本文介绍一种先进的泥芯坝(海塘)施工方法,根据潮汐水位选择施工时机, 采用打竹桩固定泥管袋位置,根据坝基(涂面)高程确定泥管袋容积。
In this paper, an advanced construction method of mud core dam (seawall) is introduced. According to the timing of tidal water level selection, the location of mud tube is fixed by bamboo punching, and the volume of mud tube is determined according to the elevation of the dam foundation.