论文部分内容阅读
在混凝土保护层厚度实体检验过程中,有时会遇到一些常见的而又极易被忽略的实际细节问题,使人们感到困惑不解而误入歧途,以下就为大家作一下简要介绍。误区之一不论何种构件一律检验大家知道,钢筋安装之后,经过隐蔽工程验收才能浇筑混凝土。但已经验收合格的钢筋骨架或网架经过混凝土浇筑、振捣等施工过程,不可避免地会受到振动和扰动,使原本验收合格的钢筋发生位移和错位,这种钢筋位置的偏移在某种程度上可能引起混
During the physical inspection of concrete protective layer thickness, some common practical details that are easily overlooked are sometimes encountered, causing people to be confused and misunderstood. The following is a brief introduction for everyone. One of the errors No matter which type of component is to be inspected, we all know that after the steel bar is installed, the concrete can be poured after inspection of the concealed project. However, the steel bars or lattices that have been checked and passed through the construction process of concrete pouring, vibrating, etc., will inevitably be subject to vibration and disturbance, so that the originally accepted steel bars will be displaced and misaligned. To a degree may cause confusion