七号矿体是东乡铜矿主要矿体之一。由于勘探程度较差,未做选矿试验而不能满足近期生产建设要求。我矿对七号矿体进行了开发勘探,只用九个月时间,施工十个钻孔,投资15万元、新增工业储量(铜金属)3.6万吨,使原来勘探保有储量增加59.03%。其中高品位富矿储量增加三倍。在开发勘探中也查定了金、银的含量,其中新发现富矿中银的含量超过单独银矿工业指标的1.3倍,
No. 7 ore body is one of the main ore bodies in Dongxiang Copper Mine. Due to the poor exploration, mineral processing test did not do and can not meet the recent production requirements. I mine exploration and development of No.7 ore body, only nine months time, the construction of 10 boreholes, an investment of 150,000 yuan, the new industrial reserves (copper and metal) 36,000 tons, so that the original exploration reserves increased by 59.03% . Among them, high-grade rich ore reserves tripled. During exploration and development, the contents of gold and silver were also ascertained. Among them, the content of newly-discovered silver in the rich ore exceeded 1.3 times of the industrial index of silver mine alone,