化工企业零星工程施工进度及质量对企业安全生产具有重要影响。零星工程涉及范围广,工程项目数量较多且单个工程量较小,管理具有一定难度。此外,由于零星工程施工人员多是农民工,知识水平较低,安全意识及质量观念较差,施工质量较难保证。零星工程管理能力较为薄弱,零星工程管理风险日益凸显。零星工程在企业的生产链上起着至关重要的作用,为确保工程质量,同时为企业的安全生产提供保障,提出了“421”模式的管理方法。通过工程应用发现:“421”管理方法不仅可以显著提高施工进度,又能较好的保证工程质量,为企业的平稳运行提供保障,可以在一定程度上提高企业的经济效益。
The construction progress and quality of the sporadic construction of chemical enterprises have an important impact on the safety of enterprises. Sporadic projects involving a wide range of projects with a large number of single and smaller, management has a certain degree of difficulty. In addition, due to sporadic construction workers are mostly migrant workers, low level of knowledge, safety awareness and quality concept is poor, construction quality is more difficult to guarantee. Scattered project management capacity is relatively weak, increasingly prominent risk of sporadic project management. Sporadic projects play a crucial role in the production chain of the enterprise. In order to ensure the quality of the project and provide security for the enterprise at the same time, the “421” mode of management is proposed. Through the application of the project, it was found that the “421” management method can not only significantly improve the construction schedule, but also ensure the project quality better, guarantee the smooth operation of the enterprise and improve the economic benefits of the enterprise to a certain extent.