论文部分内容阅读
介绍了凤凰山铜矿碎磨系统长期不能达标达产的生产现状,研究了冬瓜山铜矿半自磨试生产实际及武山铜矿碎磨改造的成功经验,提出了砾磨机节能改造方案,并论证了增产节能效果。
This paper introduces the production status of Fenghuangshan copper pulverizing system which can not reach the standard for a long time, studies the successful experience of semi-autogenous mill production in Dongguashan Copper Mine and the successful reconstruction of the pulverized coal mill in Wushan Copper Mine, puts forward the plan of energy- And demonstrated the energy-saving effect of increasing production.