论文部分内容阅读
滑动模板是混凝土浇筑工程的一项机械化施工技术,近年来,在我国水利水电建设中已开始得到应用,积累了不少经验。实践证明,采用这项施工技术,在节约木材、加快施工进度、降低工程造价、减轻劳动强度等方面,具有显著效果。本刊本期发表的北京市苇子水水库工程指挥部、水电部第二工程局和水电部第五工程局应用滑模施工的经验都说明了这一点。因此,建议各有关单位积极组织推广这项施工技术;同时,要在滑模结构设计、施工工艺、扩大应用范围等方面大力开展试验研究,认真总结实践经验,以推动滑模施工技术的不断发展,加快水利水电建设的步伐。
Sliding formwork is a mechanized construction technology of concrete pouring project. In recent years, it has been applied in the construction of water conservancy and hydropower in our country and accumulated a lot of experience. Practice has proved that the adoption of this construction technology has significant effects in saving timber, speeding up construction progress, lowering construction costs and alleviating labor intensity. This issue published in Beijing reed water reservoir project headquarters, Ministry of Water Resources and the Fifth Engineering Bureau of the Fifth Engineering Bureau sliding mode construction experience shows that. Therefore, it is suggested that all relevant units actively organize and promote this construction technology. At the same time, it is necessary to vigorously carry out pilot studies on the design of sliding mold structure, construction technology and application of scope, and earnestly sum up practical experience to promote the continuous development of sliding mode construction technology , Speed up the pace of construction of water conservancy and hydropower.