论文部分内容阅读
因为工业园区一家企业出了安全事故,相关部门组织了安全检查。来到我们学校,重点检查配电房(那家企业安全事故就出在“电”上:电动厂门的电缆线漏电,工人因为接触到金属的电动门,触电身亡)。检查之后,学校即刻接到书面整改通知,总体一句“配电房问题大”:无防鼠板、应急灯,无五项管理制度,无绝缘手套、隔电棒、绝缘靴,无用电辅助工具,存放有杂物。除此具体的问题通报,
As a result of a safety accident in the industrial park, the relevant departments organized a safety inspection. Came to our school, focusing on checking the power distribution room (that corporate safety accident on the “electric ” on: electric plant door cable leakage, workers because of access to the metal electric door, electric shock death). After the inspection, the school immediately received a written rectification notice, the overall sentence “power distribution room problems ”: no mouse board, emergency lights, no five management system, no insulation gloves, isolation rods, insulated boots, Auxiliary tools, stored with debris. In addition to this specific issue of notification,