小湾工程右岸高边坡施工项目管理

来源 :施工企业管理 | 被引量 : 0次 | 上传用户:mercurian88
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
小湾电站地处云南大理州南涧县与临沧市凤庆县交界的澜沧江中游河段,为澜沧江河段的龙头电站。电站以发电为主,兼有防洪、灌溉、拦沙及航运、环境保护等综合效益。枢纽工程由混凝土双曲拱坝、坝后水垫塘及二道坝,左岸一条泄洪洞及右岸地下引水发电系统、升压站等组成。具有非常优越的多年调节功能,正常蓄水位为EL1240米高程,水库总容量为149亿立方米,坝高292米,为当今世界已建和在建工程中的最高双曲拱坝。建立精悍高效的机构保证项目合理运作 Xiaowan Power Station is located in the middle reaches of the Lancang River at the junction of Nanjian County, Dali Prefecture, Yunnan Province and Fengqing County, Lincang City. It is the leading power plant in the Lancang River. Power plants to generate electricity, both flood control, irrigation, sand blocking and shipping, environmental protection and other comprehensive benefits. The hub project consists of a concrete double-curvature arch dam, a water cushion pool and two dams behind the dam, a spillway tunnel on the left bank and a right-bank diversion power generation system on the right bank and a booster station. Has a very good multi-year regulatory function, the normal water level EL1240 meters elevation, the total reservoir capacity of 14.9 billion cubic meters, dam height 292 meters, is the world’s highest construction and construction projects in the highest double-arch dam. Establish lean and efficient institutions to ensure the project is functioning properly
其他文献
明确规定了国有企业党组织的职责,其中的一个重要内容是明确规定党组织参与企业重大问题的决策.国有企业党组织参与企业重大问题决策,是发挥党组织政治核心作用的必然要求.
网络作为“第四种媒体”,已经给人们的生活与社会的发展带来了深刻的影响.传统报业的发展在新媒体环境的包裹之下寻求着自身的生存,传媒是传播与延续客观信息的永恒载体,如何
不少人付出了辛勤的劳动,工资却被拖欠,变相克扣,得不到相应的报酬。其中一个重要原因就是对与工资相关的法律、法规不了解,总认为工资多少用人单位说了算,让用人单位钻了空
期刊
在以往的行政管理实践中 ,我们习惯于从“强化”与“弱化”的意义上去理解行政权威 ,却很少关注行政权威的性质和类型 ,因而 ,使对于“强化”的激励和对于“弱化”的控制 ,都
期刊
期刊
文章从积极应对入世、促进行业协会发展的角度出发,指出行业协会应大力提高的“四种能力”,并加以详细论述.
我们村韩某有相连的瓦房三间.今年年初韩某病故,他的三个儿子各分得一间房.分房后,韩某小儿子找到我,说他准备外出打工,问我想不想买他那间房.经商量,他答应以5000元的价格将
游戏规则:根据“横向”、“纵向”的提示,将答案填入表格中相应的位置即可,每格只可填入一个字。横向:一、杜甫《茅屋为秋风所破歌》中,“高者挂罥长林梢”的上句。二、《房
期刊