高碑店变电站工程不仅要求质量高,而且要求速度快,成本低。但是,从施工条件来讲,又此以往工程要差些,设备残缺不全,施工水平又低。在这种情况下要做好质量把关工作,是有一定困难的。况且,在这个工程中,做质量检查具体工作的只有我一名质量检查工,加上自己缺乏经验,工作能力又低,遇到的困难就会更多。但是,当我想到农村电气化的前景,使我鼓起了勇气,克服了畏难情绪,经过一番努力,终于取得了点滴成绩。今将自己的一些做法和体会介绍如后:一、贯彻“预防为主,检查为辅”的精神
Gaobeidian substation project not only requires high quality, but also requires fast and low cost. However, in terms of construction conditions, the previous project was worse, the equipment was incomplete, and the construction level was low. In this case, it is difficult to do quality control. Moreover, in this project, only one quality inspection worker is responsible for the specific quality inspection work, coupled with my lack of experience and low work capacity, the difficulties encountered will be even greater. However, when I think of the prospects of rural electrification, I have gained courage and overcame my fear of difficulty. After some hard work, I finally achieved some results. Here are some of your own practices and experiences as follows: First, carry out the spirit of “prevention first, inspection aided”