论文部分内容阅读
波音787第一架飞机由于总装时出现了意想不到的问题而被迫将整个项目进度推迟了6个月。此后,波音公司一直没有公布任何关于项目进展的信息。在2007年12月12日,接替迈克·拜尔成为波音公司副总裁兼787项目总经理的帕特里克·沙纳罕向公众和媒体介绍了波音787项目的供应链问题和“恢复”情况,同时还透露了波音787的一些技术的细节。
The first aircraft of the Boeing 787 was forced to postpone the entire project by six months due to unforeseen problems with the assembly. Since then, Boeing has not released any information on the progress of the project. On December 12, 2007, Patrick Sandana, succeeding Mike Bayer as Vice President and General Manager of the 787 Program at Boeing Company, introduced the Boeing 787 supply chain issue and “Recovery” situation to the public and the media, Also revealed some of the technical details of the Boeing 787.