论文部分内容阅读
丹江口水利枢纽管理局水库调度处主任工程师张羽铮刚刚参加完全国“五一”劳模表彰大会,未洗尽途中征尘,便投入了工作。他说:“水情预报必须准而及时。汛期即将来临,我应立即回到工作岗位上去。” 1959年4月,年轻的张羽铮从成都水利电力学校毕业,即来到汉江上最大的水利枢纽工地上。是时,丹江口水利枢纽开工仅一年多一点。从此,张羽铮的事业、理想便和丹江口水利枢纽紧紧连在一起。从担任工程科的安全员兼施工调度,到1960年7月调任水情组的水文预报;从1973年丹江口水利枢纽的胜利完工到1983年的洪水准确预报;从55次之多的正确预报的大
Danjiangkou Hydraulic Complex Reservoir Management Division director Zhang Yuzheng just attended the “51” labor model commendation ceremony, did not wash away the way dust, they have been put into work. He said: “The hydrological forecast must be quasi-timely. The flood season is approaching, I should immediately return to work.” In April 1959, young Zhang Yuzheng graduated from Chengdu Institute of Water Power, which came to the largest Han River Water Conservancy Project site. Yes, Danjiangkou Water Control Project started only a little more than a year. Since then, Zhang Yuzheng’s cause, the ideal and the Danjiangkou Water Conservancy are closely linked together. From serving as a security engineer and construction manager in the engineering department until July 1960, he was transferred to the Hydrological Group for hydrological forecasting; from the completion of the Danjiangkou hydro-junction in 1973 to the accurate prediction of flood in 1983; from 55 times as many as the correct forecast Big