论文部分内容阅读
根据泥沙管理的观点,概述了在设计阶段适当采用的某些结构特点,有助于改进水电工程的设计,从而最终改善其运行工况。
From the point of view of sediment management, some of the structural features that are appropriately adopted during the design phase are outlined to help improve the design of the hydropower project and ultimately improve its operating conditions.