论文部分内容阅读
一1956年8月,我由水电部重庆建筑工程学校毕业,分配到云南水电工程局工作,工程局机关设在一个叫“干沟”的坝子里,管理着以礼河四个梯级水电站的工程建设。以礼河水电站,是我国第一个五年计划兴建的五个大型水电站之一。水电站的主体工程项目有:拦河大坝、地下厂房、隧洞和高压钢管输水管道,技术要求较高,工程局请来了苏联专家和捷克专家。我校20个同学,大部分分在“土建工程处”蹲办
In August 1956, I graduated from the Chongqing Construction Engineering School of the Ministry of Water Resources and Electric Power and was assigned to work in Yunnan Hydropower Engineering Bureau. The agency of the Engineering Bureau is located in a dam called “Danggou” and manages four cascade hydropower stations The construction of the project. The Lihe Hydropower Station is one of the five large hydropower stations to be built in China’s first five-year plan. The main hydropower projects are: dam, underground powerhouse, tunnels and high-pressure steel pipelines, high technical requirements, the Bureau invited the Soviet experts and Czech experts. My school 20 classmates, most of the points in the “Civil Engineering Office” squatting