为合理利用好风能资源,张家口市统一规划,加快风能开发步伐。2007年张家口市被国家定为第一个百万千瓦级风电基地,2010年全市风电累计并网容量全国地级市排名第一。随着风电产业的快速发展,风电消纳难题逐渐凸显。为此,该市提出风电规模化发展与区域电网支撑能力相协调的原则,加快风电输出工程建设,确保电网安全稳定运行。
To make rational use of wind energy resources, Zhangjiakou City, unified planning, speed up the pace of wind energy development. In 2007 Zhangjiakou City was the country as the first million kilowatt-class wind power base in 2010, the city’s total wind power grid capacity of the prefecture-level city ranked first. With the rapid development of wind power industry, the problem of absorbing wind power gradually becomes prominent. To this end, the city proposed the principle of coordinating the large-scale development of wind power with the support capacity of regional power grids, speeding up the construction of wind power output projects and ensuring the safe and stable operation of power grids.