论文部分内容阅读
铜街子水电站系大渡河规划的最末一个梯级,地处乐山市沙湾区新华镇,装机容量为60万千瓦。按西南电网规划要求,电站与总调度所之间应有传送调度、行政、远动、数据和水情等多种信息的通道。目前川西地区电力通信只有电力载波一种手段,且通道数量有限,不能满足通信要求。成都——铜街子水电站(简称成——铜)微波通信工程,是铜街子水电站的配套工程之一,在电站施工期间直接为工程指挥和报汛防汛工作服务;在电站建成
Tongjiezi hydropower station is the last step of Dadu River planning, is located in Xinhua Town, Shawan District, Leshan City, with an installed capacity of 600,000 kilowatts. According to the planning requirements of Southwest Power Grid, there should be a channel for transmitting various information such as dispatching, administration, teleoperation, data and hydrology between the power station and the master dispatch center. At present, power transmission in western Sichuan is only a means of power line carrier, and the number of channels is limited, which can not meet the communication requirements. Chengdu - Tongjiezi Hydropower Station (referred to as - copper) microwave communications project, is one of the supporting projects Tongjizi Hydropower Station, during the construction of the station directly to the project command and flood control work for flood control; built in the power plant