为CEFR燃料组件模拟运输用的试验件和燃料组件安装调试用的试验件于2002年完成施工设计,并于2003年3月在上海第一机床厂加工完毕通过了验收,前者为CEFR燃料组件从满洲里运至北京而进行的模拟运输提供试验件,它的结构几何尺寸、质量和加工与堆用燃料组件几乎完全相同,不同的只是燃料采用代用材料;后者主要用于CEFR堆芯燃料组件的试安装、水力学调试、吊装运输以及对销冷却进行过滤,除去在安装、调试中进入堆芯内的杂质,完成上述任务后,方可将正式的燃料组件装入堆芯。这种试验件外形尺寸和重量与正式燃料组件完全一样,这样便可模拟燃料组件的安装和吊装运输,但它的内部结构不同于正式的燃料组件,它通过内部的节流装置和过滤器分别进行水力学调试和清除堆芯钠冷却剂中的杂物。
The test pieces for the simulation and transportation of CEFR fuel assemblies and the installation and adjustment of the fuel assemblies were completed in 2002 and were accepted for inspection in March 2003 at the Shanghai No.1 Machine Tool Plant. The former passed the acceptance inspection for CEFR fuel assemblies Simulated transport from Manchuria to Beijing provided test pieces that were almost the same in terms of structural geometry, quality and processing as fuel assemblies, except that the fuel was a substitute for the fuel; the latter was mainly used for the CEFR core fuel assemblies Test installation, hydraulics commissioning, hoisting transport and pin cooling are filtered to remove impurities entering the core during installation and commissioning. Only after this is done can the official fuel assembly be loaded into the core. The test piece is exactly the same size and weight as the regular fuel assembly, which simulates the installation and lifting of the fuel assembly, but its internal structure is different from that of a formal fuel assembly, with internal throttling devices and filters, respectively Perform hydraulics to debug and remove debris from the core sodium coolant.