珠江河口治理开发规划情况

来源 :人民珠江 | 被引量 : 0次 | 上传用户:kill5678
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、珠江河口的基本情况珠江河口由八大口门所组成。东面四门分别是虎门、蕉门。洪奇沥和横门,同注入伶仃洋;西面四门中的磨刀门和鸡啼门注入三灶岛与横琴岛之间的海域;虎跳门和崖门注入黄茅海。珠江河口的前缘东起香港九龙黑咀,西至台山县鹅尾尖,大陆岸线长450多公里。口外散落在30米水深线以内的大中小 First, the basic situation of the Pearl River estuary The Pearl River estuary is composed of eight mouth. The four east are Humen, banana door. Hong Qi Lek and cross the door, with the injection into the Ding Ding Yang; west of the four doors in the knife gate and Jitie door into the sea area between the Three Kao Island and Hengqin Island; tiger jump door and Yamen into the Huang Maohai. The front of the Pearl River Estuary starts from Hongkou Kowloon, Hong Kong, west of Taishan County, tail tip, the mainland coastline of more than 450 kilometers. Mouth scattered in 30 meters deep within the depth line
其他文献
为了建立水利水电科学技术情报检索系统,水利电力部科技情报所组织有关专家、工程技术人员和科技情报工作者编写的《水利水电科学技术主题词典》已由科学普及出版社出版发行
黄河三门峡水利枢纽采用了特殊的泄流方式——双层孔泄水建筑物。虽然当初曾进行过常压和减压的模型试验,证明其可行性,并从建成到1981年期间发挥过效益,但在1981年发现其底
当前,关于婚恋电视剧家庭关系的研究多基于法律学、社会学范畴,而且大多都是从背叛者背叛婚姻的原因进行分析,亦或是单独的从婚姻受害者一方的利益进行探讨,很少从剧中丈夫、
1987年11月12~17日,由水利水电规划设计院主持,在长春召开了水利水电工程钻孔压水试验新规程讨论会。会议就新规程修订的基本原则和主要技术内容进行了认真讨论和研究。 Nov
珠江磨刀门综合治理开发工程,位于广东省珠海市经济特区西侧。第一期工程为鶴洲北片、三灶湾片、洪湾西片和洪湾北片,围海造田开发面积共8.53万亩。工程已于1983年冬开工,至
AIM:To investigate the apoptosis-inducing effect ofCaspases-3 expressed by constructed eukaryotic vector ongastric cancer cell line SGC7901.METHODS:PCR was emp
本文着重分析建国以来中西地区水电建设实践中存在的主要问题及其进一步开发的有利条件,最后根据技术经济和社会环境诸方面的综合研究,提出加速全区水电资源开发的四项基本战
AIM:To clarify the location and distribution of Kupffer cellsin hepatocellular carcinoma(HCC),and to investigate theirrole in hepatocarcinogenesis.METHODS:Kupf
复方风湿灵胶囊系由风湿病学专家张进玉教授经数十年试验和临床探索通过十五代配方和500多种中西药筛选制成的复方制剂,为国内首创药。临床用药通过数万例病人的疗效观察和
(一) 概述新安江水电站大坝建在倒转背斜和倒转向斜公共反常翼上,泥盆纪地层覆盖在下石炭纪地层之上,即老地层掩覆新地层的所谓倒转构造。岩层产状走向北30°~50°东,倾向南